Header Ads

ad728
  • Breaking News

    Sewri-Worli connector by 2023, to cost Rs 1.3k cr

    Work on the long-delayed Sewri-Worli connector is expected to start soon as the MMRDA has finalised the contractor for the Rs 1,276-crore project. The 4.5km flyover will connect the under-construction Mumbai Trans-Harbour Link (MTHL) with the Bandra-Worli Sea Link (BWSL), cutting down an hour’s travel time between the two points to just 10 minutes.

    from Mumbai News: Latest Mumbai News Headlines & Coronavirus News Updates from Mumbai - Times of India https://ift.tt/378Jpm7
    via IFTTT

    No comments

    Post Top Ad

    ad728

    Post Bottom Ad

    ad728